house - week 2

the basement form is in.  i should probably know more about it, but i don't.  it is a system for optimal energy efficiency and styrofoam, but i don't know more beyond that - matt does.  maybe i will question him before i post next time.  the basement will have 10' ceilings as well which is why it looks so high.
looking up the driveway.

the 'boarder' is the outline of the garage pads - there is a double (center) and a single (left).

matt and mason standing in front of the single garage where it will face the road.

back of the house, walkout basement

matt and mason in the basement.

madelyn and mason in the basement.  they were really excited to play in the rocks.

from the path behind the house (mason is walking down)

some of the duck neighbors

maddux' first time outside of the van at the lot (it has always been super cold/windy so we have just left him in the van).  i think he approves.

i showed the kids how to use a big stick for walking.

happy boy!

2 comments:

Witenkling Mommy said...

Three-car garage? ooh, I'm envious. Looks like a good start. Lots of land around for roaming, too.

mom2mlg said...

Yes, that was one of Matt's wish list items. Plus, the way they are set up allows for a lot of room for strollers, bikes, wagons, etc. away from the cars.